Office fit-out checklist for CFOs: how to control cost and schedule risk

By the Officea team6 min read

Fit-out budgets rarely fail because of one large mistake. They drift through many small ones: a brief that was not frozen, items missing from the quote, approvals that took longer than planned, and changes agreed verbally on site. A CFO does not need to manage the construction to prevent this. A few well-placed checks before and during the project do most of the work.

Why fit-out budgets drift

Before you sign

During construction

At handover

The role of the delivery model

A single-source design and build contract makes several of these checks easier, because design, engineering, procurement and construction sit under one team and one cost plan. It does not remove the need for discipline on your side: a clear brief, a written scope, and controlled changes. If you are comparing proposals, ask each firm to show how they would handle every line of this checklist.

Planning an office project?

Tell us your city, approximate area and target move-in date. Our design and build team will discuss your requirements and prepare a costed proposal.