Key points
- Design and build already gives you one firm responsible for design, cost, programme and site.
- A PMC earns its fee when you need independent checking or third-party reporting.
- Write down who approves drawings, materials, bills and changes, or roles will overlap.
- Smaller projects can use a cost check and a snagging inspection instead of a full PMC.
Do you need a PMC if you hire a design and build firm?
Not always. Design and build already gives you one firm responsible for design, cost, programme and site. A PMC earns its fee when you need independent checking: a large or multi-site project, a board or global real estate team that wants third-party reporting, or no one in-house to review the work.
PMC vs design and build firm: who does what
| PMC | Design and build firm | |
|---|---|---|
| Works for | You, independent of the contractor | Itself, under one contract with you |
| Main job | Plan, check and report on cost, programme and quality | Design, price and build |
| Cost | A separate fee | Included in the design and build price |
| Design | Coordinates your designers | Does the design |
| Quality checks | Independent inspections | Its own quality control; you should still inspect |
| Responsibility | Advises; does not build | Single point of responsibility |
Do you need a PMC?
| If this is you | Our view | Why |
|---|---|---|
| Large or multi-site project | Add a PMC | Independent control across many contracts |
| Board or global real estate team wants third-party reports | Add a PMC | Reporting from someone with no stake in the contract |
| Separate designer and contractor (traditional route) | Add a PMC or strong in-house lead | Someone must coordinate the parties |
| Mid-size office, design and build with a fixed price | PMC optional | One firm already carries design, cost and site |
| Small office, no in-house lead | Cost check plus snagging inspection | Independent checks at the points that matter |
What does a PMC do on an office fit-out?
A PMC represents you: setting the brief and budget, selecting consultants and contractors, checking costs and certifying bills, tracking the programme, inspecting quality and safety, coordinating approvals, and managing handover and snagging.
The value is independence: the PMC has no stake in the contractor’s margin. The cost is a separate fee and another layer of review, which is worth it when the project is large or complex enough to need it. For the different ways to buy a fit-out, see design and build, turnkey or general contracting.
When does a PMC duplicate work?
When the design and build firm already provides a fixed price, programme and site management, and the PMC repeats the same reviews without clear authority. Agree in writing who approves drawings, materials, bills and changes.
Overlap shows up as two sets of comments on every drawing and approvals that wait for both. Give the PMC the decisions that need independence (bills, variations, quality sign-off) and leave design development and site coordination with the design and build firm.
What can a smaller company do instead of hiring a full PMC?
Name one person in-house as the project owner, have a cost consultant check the BOQ before you sign, and hire an independent snagging inspection at handover.
That covers the three points where an independent eye matters most: the price, the decisions during the job and the quality at the end. Our guide on how to conduct an office snagging inspection lists what to check.
Does Officea work with PMCs?
Yes. Many of our projects come through architects and project management consultants. We build to their drawings, submit shop drawings and samples for approval, and route every change, cost or programme decision through them.
More on how we work alongside consultants is on our page for architects and PMCs. If you are running the project yourself, our design and build service gives you one contract for design, MEP and construction, with a costed BOQ before work starts.
See every Officea comparison, each with a short answer, on the office fit-out comparisons page.