Quick answer: Turnkey office interiors means one contractor delivers a finished, ready-to-occupy office under a single contract and price: design, engineering, approvals support, civil and finishing work, MEP, furniture and handover. A good turnkey scope is written item by item, so you know exactly what is inside the price and what is excluded.
What "turnkey" actually means
In a turnkey fit-out you hand over the keys of an empty or old floor and receive the keys of a working office. The contractor takes responsibility for every step in between, so you deal with one project manager, one schedule and one invoice trail instead of coordinating a designer, a civil contractor, an electrician, an HVAC vendor and a furniture supplier yourself.
That is especially valuable for a team opening a location in a city where it has no local facilities expertise, such as a head office setting up a new branch: the coordination burden sits with the contractor rather than with someone on your team learning a new city's contractor landscape from scratch. Officea runs turnkey projects the same way across Delhi, Gurgaon, Noida, Bangalore, Mumbai, Chandigarh and Goa: one proposal, one price, one project manager. What changes city to city is execution detail such as local vendor networks, municipal approvals and typical building stock.
Key terms used in this guide:
- Turnkey: a contract in which the contractor delivers the complete, usable office for an agreed price.
- Design-and-build: design and construction are done by one company under one contract. Most turnkey projects are design-and-build projects with a wider scope that includes furniture and systems. See our design and build service.
- Bill of quantities (BOQ): the itemised list of work, materials, quantities and rates behind the price.
- Scope of work: the written list of what is included and excluded.
- Change order: a written, priced agreement to add or remove work after signing.
What a turnkey scope should include
Scopes differ from firm to firm, so treat the list below as a checklist to compare against any proposal you receive.
1. Design and planning
- Brief, site survey and measured drawings.
- Space planning and test-fit layout (how many seats, cabins and meeting rooms fit).
- Concept design, material palette and 3D visuals.
- Detailed working drawings for civil, ceiling, flooring, joinery, electrical, HVAC, plumbing and fire.
2. Engineering and approvals support
- Structural checks for any new loads, such as a server room, stone cladding or a heavy storage zone.
- MEP engineering: load calculations for electrical and cooling, plus fire detection and fire-fighting design that fits the building.
- Support with landlord approvals, fire department requirements and occupancy paperwork. The statutory fee itself is usually paid by the client, so check whether it is included.
3. Civil and finishing work
- Partitions, dry-wall and glass partitions.
- False ceilings, flooring (carpet tile, vinyl, tile or stone), painting and wall finishes.
- Doors, hardware, reception, pantry, washrooms and fixed joinery.
4. MEP works
- Electrical distribution, lighting, power points and earthing.
- HVAC: split units, VRF, packaged units or chilled-water terminals, ducting and controls.
- Plumbing and drainage for pantry and washrooms.
- Fire detection, alarm, sprinklers and emergency lighting, designed with reference to the National Building Code of India 2016 (Part 4 on fire and life safety, and Part 8 on building services).
5. Furniture, AV and IT
- Workstations, task chairs, cabins, meeting tables and storage.
- Meeting-room AV, display screens and cable management.
- Structured cabling and, where specified, the server or network room build-out.
6. Project management and handover
- One project manager, a fixed schedule and regular progress reviews.
- Quality checks, snag list closure and final cleaning.
- As-built drawings, warranties, operation manuals and basic staff training for systems. Our office handover checklist lists what to expect.
What is often excluded (read these lines twice)
Most disputes in fit-outs come from items that the client assumed were included. Ask for each of these to be marked "included", "excluded" or "client scope" in writing:
- GST: quotes are usually before GST, so add it to your budget.
- Landlord and building charges: security deposits, fit-out deposits, lift and parking charges, and any base-building works the landlord has not delivered.
- Statutory fees and third-party inspections: fire NOC or renewal fees, power connection or enhancement charges and similar.
- IT hardware and software: laptops, servers, network switches, telephony and licences.
- Loose or branded furniture: executive chairs, lounge pieces and artwork, unless specified.
- Specialist items: UPS and battery banks, generators, access control, CCTV and building management systems, unless named.
- Out-of-hours work: night and weekend work that a building may require.
Turnkey vs design-and-build vs traditional contracting
| Aspect | Traditional (designer plus separate contractors) | Design-and-build | Turnkey |
|---|---|---|---|
| Contracts | Several | One for design and construction | One for everything to handover |
| Who coordinates trades | You or a project manager you hire | The design-and-build firm | The turnkey contractor |
| Furniture and AV | Usually separate vendors | Sometimes included | Normally included, if specified |
| Price certainty | Builds up in stages | Fixed after design is frozen | Fixed for the agreed scope |
| Accountability if something fails | Split between parties | One firm | One firm |
| Best for | Teams with in-house project staff | Most corporate fit-outs | Teams wanting one price and one handover date |
Our guide on design-and-build vs traditional fit-out covers the contract differences in more detail. The practical point is that turnkey reduces the number of places where cost, time or quality can fall between two vendors.
How turnkey offices are priced
There are three common ways to price a fit-out:
- Fixed price (lump sum) on an itemised BOQ: the contractor commits to a price for the agreed scope. Changes need a written change order. This is the most predictable model.
- Item-rate or measured contract: you pay for the actual quantities built at agreed unit rates. Flexible, but the final cost is only known at the end.
- Cost-plus: you pay actual costs plus a fee. This needs strong controls and is less common for standard office work.
Officea's turnkey proposals are itemised and name specific products and quantities. The signed price is fixed for the agreed scope, and anything outside it goes through a written change order. We push back on vague scope lines such as "standard furniture package" or "basic finishes", because they are exactly the phrases that create disputes once both sides discover they meant different things.
Officea's 2026 rate card for turnkey work
Rates below are per sq ft, GST extra, and apply to Delhi, Gurgaon, Noida and Chandigarh. Bangalore, Mumbai, Pune, Hyderabad, Chennai and Goa run about 10% higher. For a number specific to your floor plate, use the fit-out cost calculator.
| Tier | Officea 2026 rate (per sq ft, GST extra) | Typical profile |
|---|---|---|
| Basic | ₹1,800 | Functional finishes: laminate workstations, vinyl or basic carpet tile, painted gypsum ceiling, standard lighting |
| Medium | ₹2,200 | Better laminates, branded carpet tile, mixed gypsum and modular ceilings, task lighting |
| Good | ₹2,600 | Veneer or engineered-wood accents, premium carpet tile, glazed cabins, better meeting-room AV |
| High end | ₹4,500 | Natural stone or marble in key areas, imported finishes, bespoke joinery, statement lighting |
What moves the number within a tier:
- Shell condition: a bare shell needs ceilings, services and floors from scratch, while a previously fitted floor lets you reuse some of them.
- HVAC route: split units, VRF and chilled-water systems have very different cost and operating profiles.
- Fire changes: extra sprinkler heads, detectors, exits or fire-rated partitions required by the building.
- Furniture: ergonomic chairs, height-adjustable desks and executive pieces can change the budget quickly.
- AV and IT: large meeting rooms, video walls and server rooms add specialist cost.
How long a turnkey fit-out takes
Officea's turnkey programme is typically 6 to 16 weeks, but size, approvals and long-lead items change that. Two of Officea's own projects show what is possible when design, procurement and construction run in parallel: a 3,000 sq ft office in Gurgaon was delivered in 28 days, and a 10,000 sq ft office in Noida with full MEP was delivered in 43 days. A larger 28,000 sq ft Bangalore project with a stone-and-glass façade (stone cladding and curved glass) ran on a longer programme.
A typical sequence is:
- Brief, site survey and test fit, with one proposal covering the whole scope and price.
- Concept, material selection and costing.
- Working drawings, approvals and orders for long-lead items (HVAC equipment, glass, furniture).
- Site works: civil, services, ceilings, flooring, joinery, coordinated by a single project manager.
- Furniture, AV and IT installation.
- Testing, snagging, cleaning and one handover event, with the finished office, documentation and furniture all ready together.
Progress reviews run on a fixed, agreed schedule rather than ad hoc updates when something goes wrong. The biggest time risks are late landlord approvals, delayed long-lead orders and scope changes after construction starts. A fixed scope and early orders protect the schedule more than any promise of speed.
Payment milestones and protections
Because turnkey contracts are larger, payment structure matters. A sensible contract links payments to measurable milestones: mobilisation, material delivery, completion of civil and services, furniture installation, and a retention held until snags are closed and handover documents are delivered. Ask for a defects liability period in writing, and for a clear process for delay and change-order disputes. Avoid contracts that ask for most of the payment before work reaches the site.
Questions to ask any turnkey contractor
- Is the price fixed for the written scope, and what happens if I change something?
- Does the BOQ name brands, specifications and quantities?
- Who handles MEP design and fire drawings, and can I see sample drawings?
- Which items are excluded or in my scope?
- What is the schedule, and what are the milestones?
- What warranties, as-built drawings and training will I receive at handover?
- Can I choose my own furniture supplier if I want to?
- Who will be on site every day?
Officea Design & Build delivers turnkey projects in every state in India, with studios in Delhi, Gurgaon, Noida and Bangalore and a dedicated on-site project team for each project. If you want a complimentary site visit and a layout and budget estimate, visit officea.in or call +91 98711 11446. Our office fit-out terms explained guide covers the vocabulary used in quotes.