Office fit-out problems and solutions

Most office fit-out problems are the same few questions asked at different stages: is this quote fair, will the team fit, can it finish inside the rent-free period, why is the AC not cooling, what should we get at handover. This page answers 51 of them in a line each, grouped by topic, with a link to the full answer or a tool that works it out for your office.

Tools that answer it for your office

Compare 2–3 contractor quotes

Send the quotes you have. We check them line by line for scope gaps, brands and specifications, quantities and exclusions, as a complimentary service.

Fit-out timeline calculator

Weeks from brief to handover for your size, building and scope, and whether it fits your rent-free period.

Office layout planner

Seats, rooms and an indicative fit-out cost from your headcount and floor size.

Complimentary floor plan audit

Send your existing or proposed floor plan and we review seat count, rooms, circulation and services.

Newest answers

Why can people hear meeting room conversations?

Sound escapes through the weakest path: partitions that stop at the false ceiling, unsealed glass and doors, shared ducts and gaps. Seal and block the leaks first, then add absorption. Read the answer

Why is our office electricity bill increasing?

Usually AC running longer or colder than needed, lights and equipment left on after hours, more people and machines, more DG use, or a tariff change. Read the meter at fixed times for a week, check AC schedules and setpoints, and compare units with twelve months of bills before buying upgrades. Read the answer

Why is one cabin colder than another?

Usually the cabins share one zone and thermostat, the airflow was never balanced after partitions moved, the thermostat sits in the wrong place, or one cabin gets more sun. Log temperatures, clear blocked grilles, then have an HVAC contractor rebalance the air. Read the answer

Why does the office feel stuffy by afternoon?

Usually too little outdoor air for the number of people: AC that only recirculates, more people than designed, closed rooms with no return path, dirty filters or weak exhaust. A CO2 meter shows whether ventilation keeps up; an HVAC engineer checks fresh air against the design and codes. Read the answer

What will the landlord ask for when we leave our office?

Usually reinstatement to the condition in the lease: bare shell, warm shell or as handed over. Your partitions, ceilings, flooring and services come out, inside the notice period, before the deposit is returned. Negotiate it at signing and record the floor on move-in day. Read the answer

What does it really cost to move our office?

Far more than the fit-out. Budget seven buckets: the new fit-out, security deposit, brokerage, parallel rent on both offices, reinstatement of the old office, IT and the physical move, and downtime. Start 12 to 18 months before the lease ends and plan backwards from your move date. Read the answer

Cost and budget

How do I set an office fit-out budget before calling contractors?

Turn headcount into carpet area at 50 to 120 sq ft a seat, multiply by a rate card tier (₹1,800 to ₹4,500 per sq ft in Delhi NCR, furniture included), then add IT, AV, moving, landlord charges, GST and a contingency. Read the answer

Is my office fit-out quote too high?

Compare like with like first: scope, brands and specifications, quantities, MEP work and exclusions explain most of the gap between quotes. Send us up to three quotes for a complimentary comparison. Read the answer

What should an office interior cost per sq ft?

Officea's 2026 rate card runs from ₹1,800 (Basic) to ₹4,500 (High end) per sq ft in Delhi NCR and Chandigarh, GST extra, and about 10% more in Bangalore, Mumbai, Pune, Hyderabad, Chennai and Goa. Read the answer

Should I budget per seat or per sq ft?

Per sq ft for the building work, per seat to compare buildings and layouts. Use both, and check which one each quote is based on. Read the answer

What hidden costs do fit-out quotes leave out?

Exclusions, provisional sums, landlord charges, air conditioning, electrical and fire upgrades, IT, AV, signage, moving and GST. Ask for an itemised BOQ and a written exclusions list to price them before you sign. Read the answer

Is the lowest fit-out quote really cheaper?

Only if it prices the same scope and specifications. Low quotes often leave out work or assume lighter materials. Real savings come from a tighter layout, reusing what the floor has, choosing specifications by zone and freezing decisions early. Read the answer

How do I read a contractor's BOQ?

Check every line for item, specification or brand, unit, quantity and rate, and list what is excluded. Missing lines are where extra bills come from. Read the answer

Why do consultant benchmarks differ from contractor quotes?

Benchmarks are averages across many projects and specifications; a quote prices your floor, your scope and today's materials. Read the answer

Should the landlord pay for our fit-out?

A landlord-funded fit-out saves capex but is paid back through rent and usually ties you to a longer lock-in. Compare the total cost over the lease. Read the answer

What does an office fit-out cost for my size of office?

Multiply the area by the rate for your finish level, then add anything outside the fit-out, such as IT hardware. See worked costs by office size. Read the answer

Quotes, contractors and contracts

How do I choose an office interior company?

Shortlist on completed offices of your size, a written BOQ, who does the MEP work and who is accountable for the handover date. Read the answer

Lump sum or item rate: which contract protects us?

Lump sum fixes the price for a defined scope; item rate pays for measured quantities. Choose by how complete your design is. Read the answer

Do we need a project management consultant?

With separate designers and contractors, a PMC helps coordinate them. Under one design and build contract, one team is already accountable. Read the answer

How do we brief several contractors fairly?

Issue one written RFP with the same layout, scope and specifications to every bidder, so the quotes can be compared. Read the answer

What usually goes wrong in an office fit-out?

Unclear quotes and layouts before, approvals and changes during, and defects and comfort issues after. Most can be prevented at the brief stage. Read the answer

Design and build, turnkey or general contracting?

Design and build puts design and construction under one contract; general contracting builds someone else's design. Turnkey describes handing over a ready office. Read the answer

Space and layout

How much space do 100, 200 or 500 people need?

Plan 50 to 120 sq ft of carpet area per seat with common areas included: about 8,000 to 10,000 sq ft for 100 people in a standard corporate office. Read the answer

How many people fit in 1,000, 2,000, 5,000 or 10,000 sq ft?

Divide the carpet area by 80 to 100 sq ft per seat for a standard office: about 8 to 12 people in 1,000 sq ft and 100 to 125 in 10,000 sq ft. Convert lease (chargeable) area to carpet area first. Read the answer

Will this floor fit our team before we sign?

Get a test fit on the actual floor plate: columns, the core and the window line change how many seats really fit. Read the answer

Open plan or cabins, hot desks or fixed seats?

Open desks for most people, cabins only for roles that need privacy every day, and bookable rooms and phone booths for everyone else. Read the answer

What should we check before approving a floor plan?

Seat count against headcount, meeting room mix, exit routes, services capacity and growth space, before any drawings are detailed. Read the answer

How many toilets does our office need?

At least 1 WC per 25 men and 1 per 15 women, plus urinals, basins and an accessible toilet, under NBC 2016 and the bye-laws. Read the answer

Why does the office layout not suit how we work?

Layouts drawn from headcount alone miss how people meet, focus and take calls. Design for the behaviour you want. Read the answer

Why does our office floor waste so much space?

Columns that fall inside desk rows, a deep dark middle, an off-centre core and empty corners. Plan desks to the column grid, put rooms in the deep zone, use corners for storage and booths, and test-fit before you lease. Read the answer

Timelines and delays

My office fit-out is running late. Who is responsible?

It follows the cause and the contract: the contractor's own labour, planning or late orders are its risk; late client decisions, approvals or changes are the client's; events neither side controls usually give more time but not more money. Agree the facts, then a written recovery programme. Read the answer

How long will our office fit-out take?

Typically 4 to 8 weeks for up to 5,000 sq ft and 14 to 24 weeks for 25,000 to 50,000 sq ft, with design and site work overlapping. Try the timeline calculator. Use the calculator

Can we finish inside the rent-free period?

Only if design starts before or at lease signing and long-lead items are ordered early. Plan the programme against the fit-out period you negotiate. Read the answer

How fast can an office really be built?

Officea's published projects range from 3,000 sq ft in 28 days to 42,000 sq ft in 105 days. See what made each one fast. Read the answer

Air conditioning, light and noise

Why is our office AC not cooling, or cooling unevenly?

Usually more heat than the system was designed for, cabins added without their own zone, badly placed diffusers or returns, heat from glass facades, a building plant or fresh air supply that is not delivering, or overdue servicing. Check maintenance and controls first, log temperatures by zone, then compare the layout with the HVAC design. Read the answer

Why is one cabin colder than another?

Usually the cabins share one zone and thermostat, the airflow was never balanced after partitions moved, the thermostat sits in the wrong place, or one cabin gets more sun. Log temperatures, clear blocked grilles, then have an HVAC contractor rebalance the air. Read the answer

VRF or the building's chilled water?

Use the building's chilled water when your hours match the plant's; choose VRF for bare shell floors, many separately used rooms or late working. Read the answer

Why does the office feel stuffy by afternoon?

Usually too little outdoor air for the number of people: AC that only recirculates, more people than designed, closed rooms with no return path, dirty filters or weak exhaust. A CO2 meter shows whether ventilation keeps up; an HVAC engineer checks fresh air against the design and codes. Read the answer

Why can people hear meeting room conversations?

Sound escapes through the weakest path: partitions that stop at the false ceiling, unsealed glass and doors, shared ducts and gaps. Seal and block the leaks first, then add absorption. Read the answer

Why is there glare on screens?

Bright fittings in the wrong place, unshaded windows and screens facing the glass. Fix lighting layout, glare control and desk orientation together. Read the answer

Electrical, IT and safety

Why do the breakers in our office keep tripping?

Usually an overloaded circuit (pantry appliances, heaters, extra desks), earth leakage tripping the RCCB, unbalanced phases, old or loose wiring, or the surge at DG or UPS changeover. Note the pattern, reset once, then call a qualified electrician. Never fit a bigger breaker. Read the answer

Why is our office electricity bill increasing?

Usually AC running longer or colder than needed, lights and equipment left on after hours, more people and machines, more DG use, or a tariff change. Read the meter at fixed times for a week, check AC schedules and setpoints, and compare units with twelve months of bills before buying upgrades. Read the answer

Is our electrical load enough?

Check the sanctioned load and DG backup against a load schedule for AC, lighting, workstations and the server room before the layout is frozen. Read the answer

How should the server room be planned?

Dedicated cooling that runs around the clock, UPS, clean cable routes and controlled access, sized for growth. Read the answer

Do we need a fire NOC for our fit-out?

It depends on the state, the building and the changes you make. New partitions and ceilings change sprinkler and detector coverage either way. Read the answer

What approvals does the landlord need?

Design, MEP and fire drawings, work permits, deposit and insurance, usually set out in the building's fit-out manual. Read the answer

Existing offices and moving

Why is our office ceiling leaking or the false ceiling sagging?

Usually a blocked AC condensate drain, condensation on uninsulated chilled water or refrigerant pipes, a plumbing or sprinkler joint above, or rain through the terrace or facade. Make it safe, stop the water, dry the void, fix the source, then replace damaged boards or tiles. Read the answer

Our office looks tired: refresh or rebuild?

If the layout and services still work, a refresh updates finishes, furniture and lighting for much less than a full fit-out. Read the answer

Can we upgrade the office without stopping work?

Yes, with phased zones, night and weekend work and clear separation of site and staff areas. Read the answer

Should we renew the lease or relocate?

Compare the total cost of staying, including a refresh, against moving, including fit-out, deposit and downtime. Read the answer

How do we find out what is wrong with our office?

An office health audit checks six areas, from air and light to safety and hygiene, and rates what to fix first. Read the answer

Bare shell or warm shell: what are we getting?

Bare shell leaves floors, ceilings and services to you; warm shell includes some of them. Get the landlord's deliverables in writing. Read the answer

What will the landlord ask for when we leave our office?

Usually reinstatement to the condition in the lease: bare shell, warm shell or as handed over. Your partitions, ceilings, flooring and services come out, inside the notice period, before the deposit is returned. Negotiate it at signing and record the floor on move-in day. Read the answer

What does it really cost to move our office?

Far more than the fit-out. Budget seven buckets: the new fit-out, security deposit, brokerage, parallel rent on both offices, reinstatement of the old office, IT and the physical move, and downtime. Start 12 to 18 months before the lease ends and plan backwards from your move date. Read the answer

Handover and defects

What does the defect liability period cover after our fit-out?

Defects in the contractor's own workmanship and materials that appear after handover, usually for six to twelve months: cracks, leaks, sticking doors, wiring faults. Not wear and tear, misuse, damage by others or routine maintenance. Log each one in writing. Read the answer

What should we receive at handover?

As-built drawings, test and commissioning reports, warranties, manuals and a closed snag list, plus any approvals the building needs. Read the answer

How do we check the finished office for defects?

Walk it room by room with a written snag list, test every system and agree dates for each fix before you sign off. Read the answer

Problem not listed?

Tell us what is going wrong with your office or your fit-out and we will answer it, usually with a call. You can also browse our office tools, fit-out comparisons, the Insights blog or the fit-out cost by city.