Quick answer
There is no single renovation rate, because renovation means anything from new carpet to a complete rebuild. On Officea’s published 2026 rate card, a full renovation costs the same as a new fit-out: ₹1,800 to ₹4,500 per sq ft in Delhi NCR, ₹2,000 to ₹5,000 in Bangalore, GST extra. Partial renovations cost a share of that, set by the trades you touch: about ₹462 per sq ft for flooring, ceiling and lighting at the Medium tier in Delhi NCR, about ₹1,012 for a new layout with services and furniture kept. Renovation then adds costs a new floor does not have: strip-out, phasing, after-hours work and protection.

The office you already lease no longer fits. The finishes are tired, the layout was planned for a team half the size, or the air conditioning has never coped. Before you ask anyone for a quote, it helps to know what office renovation costs for the scope you actually need. This guide prices each scope from our published rate card, shows what renovation adds on top, and lists what a fair quote should include.
Why office renovation has no single rate
A new fit-out is priced on the whole floor, because everything is built. A renovation is priced on what changes. Two companies with the same 5,000 sq ft office can be quoted very different numbers because one wants new carpet and lighting while the other is moving every wall and replacing the air conditioning.
The most useful way to budget is to start from the full fit-out rate and take the share for each trade you are changing. Our rate card for a complete fit-out, GST extra, with furniture included:
| Tier | Delhi, Gurgaon, Noida, Chandigarh | Bangalore, Mumbai, Pune, Hyderabad, Chennai, Goa |
|---|---|---|
| Basic | ₹1,800 per sq ft | ₹2,000 per sq ft |
| Medium | ₹2,200 per sq ft | ₹2,400 per sq ft |
| Good | ₹2,600 per sq ft | ₹2,900 per sq ft |
| High end | ₹4,500 per sq ft | ₹5,000 per sq ft |
In a typical Medium fit-out, the money splits as MEP (electrical, HVAC, fire and plumbing) 28%, civil work and partitions 22%, furniture and workstations 20%, false ceiling and lighting 11%, flooring 10%, IT and low-voltage cabling 6%, and design and project management 3%. What each tier buys is set out in office fit-out finishes by tier.
Office renovation cost by scope
Applying those shares to the Medium tier gives a starting budget for the four most common renovation scopes. These are indicative figures, before GST, and before the renovation extras in the next section.
| Renovation scope | Trades touched | Delhi NCR (Medium, per sq ft) | Bangalore (Medium, per sq ft) |
|---|---|---|---|
| Finishes only | Flooring, false ceiling and lighting (about 21%) | about ₹462 | about ₹504 |
| Services upgrade | Electrical, HVAC, fire and plumbing (about 28%) | about ₹616 | about ₹672 |
| New layout, services and furniture kept | Partitions, ceiling, lighting, flooring, design (about 46%) | about ₹1,012 | about ₹1,104 |
| Full renovation, furniture reused | Everything except furniture (about 80%) | about ₹1,760 | about ₹1,920 |
| Full renovation | Everything, stripped back to shell | ₹2,200 | ₹2,400 |
At other tiers, scale the same shares: a full renovation runs from ₹1,800 (Basic) to ₹4,500 (High end) per sq ft in Delhi NCR. Real projects rarely fit one row exactly. A new layout often needs some electrical and air-conditioning changes too, because new rooms need their own power points, lighting circuits, supply air and sprinkler coverage.
If the work is mainly repainting, carpet, deep cleaning and small repairs, it is usually a refresh rather than a renovation. Our Officea REFRESH service prices those items after a walk-through, with basic services such as anti-termite treatment and carpet cleaning from ₹7 per sq ft before GST. The difference is explained in office renovation vs office refresh.
Worked example: renovating a 5,000 sq ft office in Delhi NCR
A 5,000 sq ft office at the Medium tier (₹2,200 per sq ft), before GST:
| Scope | Indicative budget |
|---|---|
| Flooring, ceiling and lighting only | about ₹23 lakh |
| MEP upgrade only | about ₹31 lakh |
| New layout, services and furniture kept | about ₹51 lakh |
| Full renovation, furniture reused | about ₹88 lakh |
| Full renovation | about ₹1.1 crore |
Budgets for other sizes are in office fit-out cost by office size. For a number based on your city and tier, use the calculator below or the office layout planner.

Costs renovation adds that a new fit-out does not
The scope figures above assume an empty floor. Renovating an office you already use adds work that a new fit-out never has. Ask for each item as its own line, so you can see it:
- Strip-out and disposal. Old partitions, ceilings, carpet and cabling have to come out and leave the building by the goods lift, often only at night.
- Phasing. If your team keeps working, the floor is done in zones, with people moved between them. Every extra phase adds set-up, protection and supervision time.
- After-hours and weekend work. Noisy and dusty work such as demolition and core cutting is usually limited to evenings and weekends by the building and by your own team.
- Protection. Dust screens, floor protection and temporary partitions keep working areas clean and safe.
- Making good. Slab, wall and ceiling repairs where old items were fixed, and patching around services that stay.
- Surprises behind the ceiling. Older buildings can hide ageing wiring, leaks or undersized ducts. A condition survey before pricing finds most of these.
- Building charges. Some landlords charge for after-hours power, lifts and security, or ask for a refundable works deposit. These sit outside a contractor’s rate.
The hidden costs of an office fit-out covers the landlord and approval items in more detail.
Where renovation saves money
- Furniture you keep. Furniture and workstations are about a fifth of a typical budget. Good systems can often be refurbished and re-planned.
- Services that still work. If the air conditioning, fire systems and electrical distribution have capacity, a layout change can extend them rather than replace them.
- Rooms that already work. Toilets, a server room or a pantry in the right place can stay untouched.
- No move. Staying avoids parallel rent, moving costs and the reinstatement of an old office. The repair, refresh or relocate guide helps you weigh this.
What an office renovation quote should include
Renovation quotes are hard to compare because each contractor makes different assumptions about what stays. Before you compare numbers, check that each quote covers:
- A condition survey of the existing floor, ceiling void and services.
- A scope by trade, with a clear list of what is kept and reused.
- Strip-out, disposal and making good as separate lines.
- The phasing plan and how much work happens after hours.
- Protection of occupied areas.
- Building approvals, and any changes to fire detection or sprinklers.
- The finish tier for each area, in the same terms across all quotes.
Our quote comparison tool lines quotes up side by side, and what a BOQ is explains how to read an itemised quote.
How long an office renovation takes
A single-phase renovation of one floor typically runs 6 to 10 weeks. Projects phased around a fully occupied office take longer, but keep the business running throughout. The building’s drawing review and its rules on after-hours work often decide the programme as much as the work itself. The fit-out timeline calculator gives a working estimate for your size and scope.
Officea plans, designs and builds office renovations from studios in Delhi (Nehru Place), Gurgaon (DLF Grand Mall), Noida (Sector 3) and Bangalore (Residency Road). See how we run office renovation projects in Delhi NCR and Bangalore, or send us your current floor plan for a complimentary floor plan audit and we will tell you which scope your office actually needs.
Frequently asked questions
How much does office renovation cost per sq ft in India?
It depends on what you renovate. On Officea’s 2026 rate card, a full renovation costs the same as a new fit-out: ₹1,800 to ₹4,500 per sq ft in Delhi NCR and ₹2,000 to ₹5,000 in Bangalore, GST extra. A finishes-only renovation (flooring, ceiling and lighting) is about ₹462 per sq ft at the Medium tier in Delhi NCR, and a new layout with existing services and furniture kept is about ₹1,012 per sq ft, before the extra costs of working around an occupied office.
Is office renovation cheaper than a new fit-out?
Usually, because you keep some of what is already there. Reusing furniture alone removes about a fifth of a typical fit-out budget. But each item you do renovate can cost more per sq ft than in a new fit-out, because of strip-out, phasing, after-hours work and protecting the areas that stay in use.
What does a 5,000 sq ft office renovation cost?
At the Medium tier in Delhi NCR (₹2,200 per sq ft), about ₹23 lakh for flooring, ceiling and lighting only, about ₹51 lakh for a new layout with services and furniture kept, and about ₹1.1 crore for a full renovation, all before GST and before renovation extras such as strip-out and night work.
How long does an office renovation take?
A single-phase renovation of one floor typically runs 6 to 10 weeks. Projects phased around a fully occupied office take longer, but keep the business running throughout.
What should an office renovation quote include?
A condition survey, a scope by trade, strip-out and disposal, phasing and after-hours working, protection of occupied areas, making good, building approvals and a clear list of what is kept. A quote that leaves these out is not comparable with one that includes them.